[vc_row full_width=”stretch_row” css=”.vc_custom_1456914929417{background-image: url(http://hillsdevelopments.com.au/wp-content/uploads/2014/10/SHACKING-HANDS.jpg?id=567) !important;}”][vc_column][vc_empty_space height=”30px”][vc_column_text]

APPROVAL PROCESS GUIDELINES…

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

Below is a list of terms and measurements that represent the basic guidelines to an approval process for granny flats.

[/vc_column_text][vc_separator el_width=”30″][/vc_column][/vc_row][vc_row css=”.vc_custom_1456928400643{margin-bottom: 0px !important;padding-bottom: 0px !important;}”][vc_column width=”2/3″][vc_custom_heading text=”SIZE :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

Minimum 450m2 lot size.

[/vc_column_text][vc_custom_heading text=”WIDTH :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

Minimum 12m wide as measured at the building line (this means the width of the block where the granny flat will be built).

[/vc_column_text][vc_custom_heading text=”MAXIMUM FLOOR SPACE (AFTER CONSTRUCTION) :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

330 if the lot has an area of at least 450 square metres but less than 600 square metres,
380 m2, if the lot has an area of at least 600 square metres but less than 900 square metres,
430 square meters, if the lot has an area of at least 900 square metres.

[/vc_column_text][vc_custom_heading text=”REAR SETBACK :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

Minimum 3m from rear boundary if lot is less than 900 m2, If lot is over 900m2 than 5m from rear boundary.

[/vc_column_text][vc_custom_heading text=”SIDE SETBACK :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

Minimum 0.9m from the nearest side boundary if lot is less than 900m2, otherwise 1.5.

[/vc_column_text][vc_custom_heading text=”HOW FAR FROM THE PRIMARY DWELLING :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

Minimum 1.8m between the Main Dwelling & the Granny Flat – If less than 1.8m than granny flat wall facing primary dwelling has to be fire rated.

[/vc_column_text][vc_custom_heading text=”MAXIMUM HEIGHT :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

3.8m as measured from the lowest natural ground level to the ridge level.

[/vc_column_text][vc_custom_heading text=”MAXIMUM EXCAVATION :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

Cut and Fill up to a maximum of 1m.

[/vc_column_text][vc_custom_heading text=”LANDSCAPING :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

20-25% minimum turf or gardens, depending on property size, calculated after Approval. 50% of the minimum landscaped area must be behind the main dwelling.

[/vc_column_text][vc_custom_heading text=”ROOF-WATER DRAINAGE REQUIREMENT :” font_container=”tag:h2|font_size:20px|text_align:left|color:%23017c41|line_height:30px” google_fonts=”font_family:Oswald%3A300%2Cregular%2C700|font_style:400%20regular%3A400%3Anormal”][vc_column_text]

All storm-water from the new granny flat must be conveyed to either:
(a) A public drainage system (the existing gravity-fed system to the street kerb), or
(b) An inter-allotment drainage system (a Registered Drainage Easement), or
(c) An on-site disposal system (we must construct a ‘Rubble Pit’ in the rear yard).

Please note that all of the requirements above must be complied with in order to achieve FAST 20 Day Approval through a Private Certifier.

[/vc_column_text][vc_empty_space][/vc_column][vc_column width=”1/3″ el_class=”sidebar_hidden”][vc_widget_sidebar sidebar_id=”blog-sidebar”][/vc_column][/vc_row][vc_row][vc_column][vc_separator][vc_single_image image=”791″ img_size=”600×84″ alignment=”center”][/vc_column][/vc_row]